info@starocasting.com WhatsApp: 0086-13851925018

HPC2

EMAIL

Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control (IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control (IPQC)
4) Checking the goods after they are finished---- Final quality control (FQC)
5) Checking the goods after they are finished-----Outgoing quality control (OQC)

PREVIOUS:HPC3 NEXT:Pin

INQUIRY